
Sections of the Threlfall track between the old dam and the penstock run through cuttings excavated from the original ground level. Wooden flumes were run through these cuttings to maintain a constant gradient for the water to flow down.
Related posts:
- Leading to the flume A concrete channel (flume) was built to lead the water...
- Sydney: Elevated cottage? I wandered from Sydney’s CBD, past Central Station, to Ultimo,...
- Threlfall Track: Looking across Looking across the gorge from the Threlfall Track (Oxley Wild...
- Threlfall Track: Tired fungus This fungus has seen better days. At the side of...
- Strzelecki Creek in flood One of Australia’s inland creeks, the Strzelecki Creek, is seen...
